Foundation and septic photos.

Kinja'd!!! "Dr. Zoidberg - RIP Oppo" (thetomselleck)
08/02/2018 at 19:17 • Filed to: houses

Kinja'd!!!3 Kinja'd!!! 7

Or as I call it, the “pre-chande lier” stage.

Kinja'd!!! Kinja'd!!! Kinja'd!!! Kinja'd!!!

DISCUSSION (7)


Kinja'd!!! SPAMBot - Horse Doctor > Dr. Zoidberg - RIP Oppo
08/02/2018 at 19:35

Kinja'd!!!0

Fun fact, Sonotube is a favorite material in modern indoor sub-woofer design. That’s all I can think about when I see it hahah


Kinja'd!!! His Stigness > Dr. Zoidberg - RIP Oppo
08/02/2018 at 19:36

Kinja'd!!!3

Man no bath tubs anywhere? Where do the workers pee? 


Kinja'd!!! shop-teacher > His Stigness
08/02/2018 at 19:38

Kinja'd!!!1

That big hole in the middle of the foundation. That's one giant bathtub fer peein' in.


Kinja'd!!! SilentButNotReallyDeadly...killed by G/O Media > Dr. Zoidberg - RIP Oppo
08/02/2018 at 19:40

Kinja'd!!!2

‘ Still in the shit’ is what we call that stage of the building. Sometimes that stage extends right out to handover to the client...


Kinja'd!!! Dr. Zoidberg - RIP Oppo > His Stigness
08/02/2018 at 19:40

Kinja'd!!!2

Directly into the septic system duhduh


Kinja'd!!! facw > Dr. Zoidberg - RIP Oppo
08/02/2018 at 22:23

Kinja'd!!!1

Out of curiosity, why does only that one area get the Delta-Drain and black paint?

Also looking at the Delta-Drain site, it appears that  it is supposed to be installed on the outside of the wall, but here it looks to be on the inside, which seems a bit ominous?


Kinja'd!!! Dr. Zoidberg - RIP Oppo > facw
08/02/2018 at 22:27

Kinja'd!!!0

I have two words for you:

new construction